VITA Technologies
  • VME
  • XMC
  • FMC
  • PMC
  • VNX
  • VPX
Menu
  • VME
  • XMC
  • FMC
  • PMC
  • VNX
  • VPX
  • Articles
  • White Papers
  • Products
  • News
Menu
  • Articles
  • White Papers
  • Products
  • News
  Industry News  Production Moves Forward on Boeing F/A-18F Super Hornet for Australia
Industry News

Production Moves Forward on Boeing F/A-18F Super Hornet for Australia

The Boeing CompanyThe Boeing Company—March 9, 20090
FacebookTwitterPinterestLinkedInTumblrRedditVKWhatsAppEmail

More stories

Pentek Introduces Real-Time Data Recording and Playback System with Multiband Transceiver

April 28, 2009

Precision Aviation Group of Companies goes live with Pentagon 2000SQL(tm) System

March 29, 2012

Radisys Announces First ATCA Single Board Computer for the 4G Market

March 30, 2009

Freescale leverages Power Architecture technology to evolve robotic, kiosk and unmanned vehicle capabilities

September 24, 2007



The outer skin of the first Boeing [NYSE: BA] F/A-18F Super Hornet for the Royal Australian Air Force (RAAF) is fitted to its forward fuselage on a pulse assembly line in St. Louis. The aircraft is approximately three months ahead of schedule and set for an early delivery date in July.

The F/A-18E/F Super Hornet, a multi-role aircraft equipped with the APG-79 Active Electronically Scanned Array radar, is able to perform virtually every mission in the tactical spectrum. The RAAF has 24 Super Hornets on order.

Each of the more than 380 F/A-18E/F Super Hornets Boeing has delivered to the U.S. Navy has been delivered on or ahead of the original delivery timeline.

FacebookTwitterPinterestLinkedInTumblrRedditVKWhatsAppEmail
Xembedded LLC a XycomVME company has announced a drop in replacement for the End of Life SBS VR7, but with much more processor power
Power Instruction Set Architecture Version 2.06 Available
Related posts
  • Related posts
  • More from author
Eletter Products

SPONSORED: 3U VPX HD Switch Doubles Backplane Density

May 14, 20250
Eletter Products

SPONSORED: Rugged 1/2 ATR Aligned to SOSA, CMFF and SAVE Ready

January 30, 20250
Consortia and Working Groups

Call for Consensus Body Members to Reaffirm ANSI/VITA 67.1-2019 – Coaxial Interconnect on VPX, 4 Position SMPM Configuration

January 28, 20250
Load more
Read also
Eletter Products

SPONSORED: 3U VPX HD Switch Doubles Backplane Density

May 14, 20250
Eletter Products

SPONSORED: Rugged 1/2 ATR Aligned to SOSA, CMFF and SAVE Ready

January 30, 20250
Consortia and Working Groups

Call for Consensus Body Members to Reaffirm ANSI/VITA 67.1-2019 – Coaxial Interconnect on VPX, 4 Position SMPM Configuration

January 28, 20250
Eletter Products

SPONSORED: SAVE Compliant Chassis for VPX and SOSA Aligned Systems

January 28, 20250
Eletter Products

SPONSORED: Introducing AirBorn’s 2300W+ VPX Power Supply

January 28, 20250
Consortia and Working Groups

VITA announces formation of VITA 100 working groups

January 13, 20250
Load more

Recent Comments

No comments to show.
  • Articles
  • White Papers
  • Products
  • News
Menu
  • Articles
  • White Papers
  • Products
  • News
  • VME
  • XMC
  • FMC
  • PMC
  • VNX
  • VPX
Menu
  • VME
  • XMC
  • FMC
  • PMC
  • VNX
  • VPX

© 2023 VITA Technologies. All rights Reserved.