VITA Technologies
  • VME
  • XMC
  • FMC
  • PMC
  • VNX
  • VPX
Menu
  • VME
  • XMC
  • FMC
  • PMC
  • VNX
  • VPX
  • Articles
  • White Papers
  • Products
  • News
Menu
  • Articles
  • White Papers
  • Products
  • News
  Industry News  Production Moves Forward on Boeing F/A-18F Super Hornet for Australia
Industry News

Production Moves Forward on Boeing F/A-18F Super Hornet for Australia

The Boeing CompanyThe Boeing Company—March 9, 20090
FacebookTwitterPinterestLinkedInTumblrRedditVKWhatsAppEmail

More stories

Mercury Systems Receives $1.5 Million Order from US Navy for DRFM Jammers

June 16, 2014

Curtiss-Wright Controls Debuts New High Resolution Dual-Channel ADC FMC Card for Rugged DSP Applications

May 5, 2009

Mercury Systems Receives $15.6M Integrated RF and Digital Subsystems Order for Electronic Warfare Application

April 5, 2017

Realty Biz News Welcomes New Contributors

September 19, 2018



The outer skin of the first Boeing [NYSE: BA] F/A-18F Super Hornet for the Royal Australian Air Force (RAAF) is fitted to its forward fuselage on a pulse assembly line in St. Louis. The aircraft is approximately three months ahead of schedule and set for an early delivery date in July.

The F/A-18E/F Super Hornet, a multi-role aircraft equipped with the APG-79 Active Electronically Scanned Array radar, is able to perform virtually every mission in the tactical spectrum. The RAAF has 24 Super Hornets on order.

Each of the more than 380 F/A-18E/F Super Hornets Boeing has delivered to the U.S. Navy has been delivered on or ahead of the original delivery timeline.

FacebookTwitterPinterestLinkedInTumblrRedditVKWhatsAppEmail
Xembedded LLC a XycomVME company has announced a drop in replacement for the End of Life SBS VR7, but with much more processor power
Power Instruction Set Architecture Version 2.06 Available
Related posts
  • Related posts
  • More from author
Eletter Products

SPONSORED: 3U VPX HD Switch Doubles Backplane Density

May 14, 20250
Eletter Products

SPONSORED: Rugged 1/2 ATR Aligned to SOSA, CMFF and SAVE Ready

January 30, 20250
Consortia and Working Groups

Call for Consensus Body Members to Reaffirm ANSI/VITA 67.1-2019 – Coaxial Interconnect on VPX, 4 Position SMPM Configuration

January 28, 20250
Load more
Read also
Eletter Products

SPONSORED: 3U VPX HD Switch Doubles Backplane Density

May 14, 20250
Eletter Products

SPONSORED: Rugged 1/2 ATR Aligned to SOSA, CMFF and SAVE Ready

January 30, 20250
Consortia and Working Groups

Call for Consensus Body Members to Reaffirm ANSI/VITA 67.1-2019 – Coaxial Interconnect on VPX, 4 Position SMPM Configuration

January 28, 20250
Eletter Products

SPONSORED: SAVE Compliant Chassis for VPX and SOSA Aligned Systems

January 28, 20250
Eletter Products

SPONSORED: Introducing AirBorn’s 2300W+ VPX Power Supply

January 28, 20250
Consortia and Working Groups

VITA announces formation of VITA 100 working groups

January 13, 20250
Load more

Recent Comments

No comments to show.
  • Articles
  • White Papers
  • Products
  • News
Menu
  • Articles
  • White Papers
  • Products
  • News
  • VME
  • XMC
  • FMC
  • PMC
  • VNX
  • VPX
Menu
  • VME
  • XMC
  • FMC
  • PMC
  • VNX
  • VPX

© 2023 VITA Technologies. All rights Reserved.