VITA Technologies
  • VME
  • XMC
  • FMC
  • PMC
  • VNX
  • VPX
  • VME
  • XMC
  • FMC
  • PMC
  • VNX
  • VPX
  • Articles
  • White Papers
  • Products
  • News
  • Articles
  • White Papers
  • Products
  • News
  News  Contracts  Boeing Awarded $30 Million U.S. Air Force Contract to Upgrade B-52s
Contracts

Boeing Awarded $30 Million U.S. Air Force Contract to Upgrade B-52s

BoeingBoeing—May 22, 20070
FacebookX TwitterPinterestLinkedInTumblrRedditVKWhatsAppEmail

More stories

Curtiss-Wright Awarded $1.17 Million Contract from MDA

March 24, 2010

Tundra Semiconductor’s Serial RapidIO Switch Selected by VMETRO

May 5, 2008

Boeing Delivered All P-8As to U.S. Navy on Schedule and on Cost in 2014

January 9, 2015

Boeing 787: The long certification journey comes to an end

September 26, 2011

ST. LOUIS, May 22, 2007 — The Boeing Company [NYSE: BA] has been awarded a $30 million U.S. Air Force contract to upgrade the B-52 fleet’s Integrated Weapons Interface Units (IWIU), providing flight crews with enhanced smart weapon visibility and control.

“IWIUs represent a significant upgrade to the B-52 fleet,” said Scot Oathout, Boeing B-52 program director. “This contract will allow us to upgrade existing fleet equipment and support future enhancements that will keep the B-52 flying a very important mission for our armed forces all over the world.”

Boeing will replace the current, three-piece interface units with a single, state-of-the-art IWIU. Boeing will assemble and test the units at its St. Charles, Mo., weapons facility, before shipping them to Wichita, Kans., where the company will prepare the modification kits for final delivery and provide engineering support during customer installation.

“Boeing, along with our Air Force customer, is committed to developing cost effective and innovative solutions for the B-52,” said Oathout. “The new IWIU also can be used in future modifications that could double the platform’s smart weapons capacity.”

Boeing will deliver the first kit in October 2008. The Air Force will perform the modifications using contract field teams at the main B-52 operating bases in Barksdale, La., and Minot, N.D. The modifications are expected to be completed by late 2011.

FacebookX TwitterPinterestLinkedInTumblrRedditVKWhatsAppEmail
Hong Kong Real Estate Tycoon Buys Boeing 787 Dreamliner VIP Biz Jet
Innovative Integration Delivers New X5-400M PCI Express Module X5-400M features dual-channel, 14-bit analog I/O @ 400 MS/s coupled with the Xilinx Virtex 5
Related posts
  • Related posts
  • More from author

The VITA Technologies 2026 Resource Guide is here!

June 15, 20260

VITA Standards Update

June 15, 20260
Articles

VITA 100 and the next phase of embedded computing standards

June 15, 20260
Load more
Read also

The VITA Technologies 2026 Resource Guide is here!

June 15, 20260

VITA Standards Update

June 15, 20260
Articles

VITA 100 and the next phase of embedded computing standards

June 15, 20260
Articles

VME in defense systems: A legacy of reliability, longevity, and determinism

June 15, 20260
Articles

MOSA, SOSA, and VITA explained: The standards behind VPX defense electronics

June 15, 20260
Eletter Products

SPONSORED: Mission-Ready Chassis Management Aligned to SOSA®

June 4, 20260
Load more

Recent Comments

No comments to show.
  • Articles
  • White Papers
  • Products
  • News
  • Articles
  • White Papers
  • Products
  • News
  • VME
  • XMC
  • FMC
  • PMC
  • VNX
  • VPX
  • VME
  • XMC
  • FMC
  • PMC
  • VNX
  • VPX

© 2023 VITA Technologies. All rights Reserved.